Tuesday, April 13, 2010

Hours

168

April 11, 2010

I had to finish up painting the top half today. That took a while because we had a wall that I had to really stretch to reach it. I was very careful because I didn't want to fall into a bunch of paint. I took me a few hours to finish the top portion but I finished it. After letting it dry a little I returned to do the second coat of it all. That one didn't take that much time. When I looked at it right before we closed it turned out really good. Now all I have to do is paint the strip across the room and also paint the doors a white type color. After that I have to put up a set of posters across the wall.


Hours - 6

April 10, 2010

Today I got to start painting the room. Of course before I could start I had to sand down the purdy that I had placed on the room yesterday. That didn't take that long. After I laid down some plastic on the ground of the room and tape them together to preserve the floor I started painting. I was only able to complete one coat on the bottom half. Tomorrow I'll be able to do the top portion because I'll have more time to do so.

Hours -5

April 9, 2010

Today we had to get the supplies for the room. We had to get paint, rollers, purdy, and painting tape. My supervisor and I went to Lowes and bought the supplies and made our way back. This was done later on during the day. Before I even started we had shipment come in. After I helped with shipment I got started putting purdy in the holes that were in the room. After I did that I couldn't paint until 1 to 5 hours after it dries. By that time I had to leave for work so it all worked out.

Hours - 5

Thursday, April 8, 2010

Hours

Hours as of April 04


152

April 04, 2010

It's Easter and yes we are open. The entire time I was there we only had a few people come in. So most of my time I just cleaned the store and move some of the stuff in the changing room around so that we lower the risk of theft by having the shoes in the room. I calculated how much square ft. the room was and my supervisor was suppose to leave me some money to go out and buy some paint and puddy to fill some of the holes. Also we have a couple of pictures that show a skater doing a trick in motion. He wants me to put them on something to look more fashion. Thumbtacks work but for only so long. Also not all the pictures are one length so I must make sure that are all one length.

H-4

April 03, 2010

Today I was giving a huge project to accomplish. We have a changing room in the back that isn't the best place to change in. We also have a couple of shows that should be in the back. Well actually I have two projects. The changing room one is to repaint the room so that sales will boost up a little bit in clothing. I've already took measurements of the square ft. of the room so to see how much paint we need to get. Another project I'm going to help on is building higher shevles for the back room where we have the shoes. My carpentry isn't the best but I've bulid boxes but I'm just going to help out with it.

H -5

Friday, April 2, 2010

April 02, 2010

We got a huge shipment of LRGs in. They are a clothing company tied to skateboarding. After we took them out and checked them off the invoice we had to put them on hangers and put them on display. This was like a game of Tetris because we had limited space to work with. We ended up taking down a lot of clothing and puting it elsewhere and have an entire wall just for the LRGs. We believe that half out store is actually the LRG company and the rest is everything else. The best part is that LRGs do sell a lot. All that took up some of the time I was there. The rest of the time was dedicated to the customers that came in. However nothing new to report.

Hours - 5.5